Published by Utah Sprinkler Company.
Step 1: Assess the site and the water supply
Start with a scale sketch showing the lawn, planting beds, slopes, paths and the areas that should stay dry. Identify the actual irrigation supply: drinking-water service, secondary water or an existing private supply. Available flow and operating pressure need to be measured together before choosing zone sizes.
Ask the municipality and water provider about the proposed connection, permits, backflow protection and inspection requirements. Those requirements vary by location and supply. Arrange utility locating through Blue Stakes of Utah 811 before excavation, follow its current instructions, and arrange separate identification of private lines that are not covered by public utility marks.
Step 2: Choose compatible zones, parts and tools
Group plants by watering needs and exposure. A lawn zone and a drip-irrigated shrub bed usually need different equipment and schedules. Match nozzle application rates, spacing and operating pressure; do not put incompatible spray and rotor patterns together just because the fittings connect.
The material list should specify approved pipe or tubing, matching fittings, valves, access boxes, heads or emitters, wiring and controller equipment. Depending on the work, tools may include appropriate cutting tools, measuring equipment, a shovel and authorized trenching equipment. Do not assume every system is PVC or that every connection uses the same joining method.
Step 3: Install to the approved plan
Confirm access and protect existing landscape features before digging. Follow the required utility clearances, pipe-cover requirements and manufacturer instructions rather than a universal trench-depth rule. Keep pipe interiors clean and leave access to valves and service points.
Supply connections, backflow assemblies, pumps and electrical work can involve requirements beyond ordinary landscape adjustments. Assign that work to appropriately qualified people and confirm any required tests or inspections. Do not alter utility-owned equipment. Set heads at a suitable finished level and flush debris from the piping before the final nozzles are installed, following the equipment instructions.
Step 4: Test coverage and check for leaks
Test each zone and inspect accessible connections, valve operation and sprinkler patterns. Water should reach the intended planting without spraying pavement or leaving obvious gaps. Check the operating pressure and compare application rates instead of trying to hide poor coverage with longer runtimes.
If a connection leaks, shut off the identified private supply and relieve pressure before assessment. Use the repair or replacement method specified for the actual material and fitting. PVC solvent cement is a joining product, not a coating to paint over a leaking pressurized joint. Do not apply it as an outside leak patch.
Step 5: Set the schedule and document maintenance
Label zones and record the components, shutoff and controller settings. Establish a schedule for the plants and soil, then adjust it for weather, rainfall and current provider restrictions. Newly seeded or sodded areas need establishment care rather than the same routine used for rooted turf.
Inspect coverage during the operating season and use an equipment-specific winter shutdown procedure. A supply shutoff alone does not necessarily drain pipes, pumps or backflow devices. Request a walkthrough and a written explanation of what maintenance and restoration are included.
Frequently Asked Questions
What is the average cost to install a sprinkler system?
A useful quote depends on the irrigated area, supply, number of zones, existing components that can be retained, access and restoration. Compare itemized scopes rather than relying on one unsupported statewide average. Include connection, controller, testing and landscape-repair work when comparing bids.
Can I install a sprinkler system myself?
Some planning and maintenance may fit a homeowner's skills, but excavation, supply connections, backflow protection and electrical work require the right knowledge and any applicable authorization. Confirm the boundaries with the provider and municipality before deciding which tasks to undertake.
How long does it take to install a sprinkler system?
Timing depends on scope, access, utility locating, material availability, inspections and restoration. Ask for a schedule tied to the actual property and required approvals; a generic number of days is not a commitment.
How do I know if my sprinkler system is working properly?
Run and observe every zone, check for leaks and runoff, confirm that valves close, and compare the wetting pattern with the intended layout. Pressure, nozzle compatibility and controller programming need to be checked together.
Do I need a permit to install a sprinkler system?
Ask the municipality and the actual water provider about the planned work. Connection, backflow, electrical and inspection requirements are not the same everywhere, so do not presume that a residential project is exempt.
Plan the next step for your property.
Compare the work involved, or describe your project when requesting an estimate.
New sprinkler systemsRequest an estimate

